GÜRALP'S
PRODUCTION CAPACITY
Production Process
Crane System Manufacturing
They form the machine frame by welding together machine parts from the machining and material preparation units in accordance with the design and within the specified welding tolerances.
Machine Production
Bridge Production
01
Raw Material Intake
After the supply of raw materials to be used in the machine to be manufactured has been secured, the material preparation unit in the relevant warehouse requests the required raw material and the process begins.
02
Material Preparation
03
Machining
The machining unit precisely processes sheet metal, rods and pipes received from the material preparation unit in accordance with the design specifications and sends them to the relevant hoist assembly unit.
04
Welded Manufacturing
05
Hoist Paint
Before attaching other accessories to the machine frame, the machine is sent to the painting unit and the machine frame and parts are painted according to the paint code specified in the project details. The machine is transferred to the assembly unit.
06
Hoist Paint Assembly
07
Hoist Test
They test the machine prepared in the hoist assembly unit in accordance with the project under static and dynamic loads, check the machine functions and approve them.
08
Packaging and Shipping
01
Raw Material Input
02
Material Preparation
03
Welded Manufacturing
04
Testing and Control
05
Sandblasting
06
Bridge Paint
07
Shipping